You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2023 First Alert LTI#20- Floorman back & hip injuries
In preparation for cementing (CMT) job operation , the crew connected the quick latch CMT head on the landing joint. While initiating the circulation, the CMT head disconnected from landing joint; hit the Floorman on his back and fell down.
How do you ensure Red/ No Go zone are barricaded? How do you ensure personnel are away from No Go zone prior energizing the pipe lines? Ensure secondary retention is provided for temporary installations which has the potential to dislodge due to stored energy
Red/ No Go zone was not barricaded Cement head pull test was not part of OEM/ procedural requirements Latching of the cement head dog lock was not confirmed The mud pump was started without ensuring personnel are clear from the No Go zone area.
Category:
Safety Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
201
Download:
English