2021 2nd Alert HiPo27 Tubing slipped from the elevator and dropped through V-door and rested on ground nearby catwalk
The crew completed POOH and LD the 3 ½” IF drill pipe. They then prepared the hoist to RIH with 3 ½” EUE tubing by changing out the tubing elevators and then proceeded to prepare the power tongs.  The AD hoisted the first joint up from the catwalk and into the elevators utilizing the winch. The roustabout on the floor proceeded to remove the winch line and soft sling from the pipe. The AD then started hoisting the pipe with the traveling blocks. The pipe’s end was still on the V door and the pipe was about at a 75 deg angle, the pipe slipped through the tubing elevators. The pipe then travelled down the V door onto the catwalk and then fell onto the ground directly beside the catwalk.
Always ensure effective TBT is conducted before each activity, even if routine. Always have the responsible person prepare the handling equipment for next job Always validate size of equipment by measuring or other means, do not leave it to visual validation only. Always maintain red zone management for all hoisting operations –Do Not hoist if red zone is not cleared Always ensure all crew members are in their correct positions for all hoisting activities Always ensure the Drillers to complete their final check of all hoisting equipment prior starting the activity Always ensure Assistant Drillers only operate the hoist under direct supervision

Category:Second AlertsDocument Type:Safety
Format:pptx<br/>Viewers:43
Download: