You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2021 2nd Alert HiPo26A Tubing got released from the basket (pipe cat basket) and dropped
While pulling out completion using two safety valves and lay down to pipe rack using pipe cat, due to high stick up and extra length of pre-installed safety valve, using the skate roller. On 21st joint, the floor man open the elevator and the tubing joint along with pre-installed safety valve jumped over the pipe cat basket and the complete joint slide down from floor level to ground. No damage, No injury. No Go zone controlled
While laying down tubulars using pipe cat, ensure the pipe is well rested on the roller before proceed to open the elevator. while laying down pipe using two safety valves, ensure to secure the pipe with winch line before opening elevator. Always ensure Red Zone –Temporary No go zone are managed all the times. Always ensure job hazards & potential risk are identified prior to start any task. Always ensure good communication between floor hands and pipe cat operator.
Category:
Second Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
33
Download: