You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd Alert Hipo#68 (Fire & explosion) Welding in reserve tank without following the process
On the 26th October 2020 at 09:00 a small leak at the base of the reserve tank was discovered by the crew that was causing a small flow of water with oil mix out onto the sand below. It was decided to have the welder to make a temporary repair on the tank. To stop the small flow of fluid the welder requested assistance and the crane was brought in to lift the tank up on one end so the welding could be completed. With the tank raised up on one end by the crane the welder started to weld a square of metal onto the tank repairing the tank. The job was intervened by HSV to validate the control measures.
Always follow your PTW process, assign a supervisor/permit holder Always when the work plan changes, inform your supervisor Always intervene and stop unsafe acts Always utilize “10 Questions for a Safe Lift” Always review your SOPs for routine and non-routine jobs Always keep good records of your PTW forms