2020 2nd Alert HiPo#54 (OHL) Civil crew while doing Backfilling activities for electrical and instrument cable trench with a Backhoe loader
ATE Civil crew assigned for backfilling activities of an Ethernet cable trench between AL-418 and Al-426. Crew while doing the activity using a Backhoe loader, the loader tooth struck and damaged a live LV Cable feeding supply to well number AL-418.
Always plan the activity according to site condition Always comply with the excavation procedure Always adopt manual excavation near live facilities Always apply a PTW for the specific activity. Always communicate with your line management in case of doubt Always conduct Dynamic Risk Review, if change in work location