You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#71 (Drops) While securing upper gyro sheave to monkey board, it dropped to rig floor
On 12th November, the operation was rigging up of Client 3rd party (Gasway) gyro sheave, after finishing TBT, derrickman was sent to monkey board to install the sheave on DC finger as per Gasway JSA and previous job performed, at the same time the drill floor crew along with the third-party were preparing rig up of the sheave for installation. Once the sheave rigging was complete, the floorman was instructed by Driller to raise the sheave to monkey board level for installation by DM as agreed in the TBT. The plan was to hang the sheave on DC finger with the sling suspended from the hook. Derrick man was already present on monkey board when the sheave was lifted to the monkey board. DM assumes that the sheave is hanging with the winch line directly. Under the wrong impression DM opens the shackle and this results in the sheave come free and dropped to the rig floor. Weight of the sheave 22.9 kg fell from a height of 25mts.
Ensure effective TBT to be chaired by relevant third-party supervisor with (DSV, TP, 3rd party Supervisor) to be involved and cover all possible hazards present in the task. Stop when you are in doubt. Do not perform the task without being clear on what is required. Ensure procedure is followed and discussed. If changes are required, conduct risk assessment . Ensure proper secondary retention to be available for the any equipment installed at height. Ensure 3rd party companies have clear procedures on how to install and use their equipment. Always Ensure the third - party premobilization process must be completed. Ensure to hang the sheave on a certified hanging point ( not on monkey board fingers ) on the derrick.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
44
Download:
English