You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiP# 67 (Drops) Uncontrolled descent of Travelling block
At 9:00am after major maintenance and inspection of travelling block and replacement of drill line, Rig Tool pusher and driller were reeving the new drill line into the draw work drum. While scooping out the mast they were continuously lowering the travelling block keeping it at 4 meters height. After upper section of mast was fully scooped out the locking pins of mast were engaged where travelling block was at height of 6 mtr with 33 wraps left on draw work. The driller then started lowering the (5 ton) traveling block from a height of 6 mtr. to rig floor level. When the block reached height of 0.5 mtr from the rig floor, it continued to descend and finally leaned down and rested on the Rig floor. The fast line disconnected from the clamp and came down to the rig floor from the fast line sheave.
Always ensure you follow the SOP while doing the task. Always ensure you maintain Drops Zone management. Always ensure supervisor is supervising the job and not doing the job. Always ensure that drill line provided with visible identification (marked) and engineering controls. Always ensure you stop the work before exceeding minimum wraps or any other equipment limitation.