You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#35 (Drops) conncetion failure during pull test
While conducting a pull test for the coiled tubing connector . The pull test plate was rigged up and the dimple clamp was applied to be pull tested at 30,000lbs against the injector head riser above the CTU BOP stack. While conducting the pull test, the CTU operator pulled to approximately 24,000lbs, when the pull test plate clamp disengaged and the test plate dropped to the rig floor with the connector.
Coiled tubing pull test should always be conducted at 1 meter height. Ensure adequate secondary retention for the test plate available and installed.