You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#13 (OHL) Excavation next to LV flowline
Mechanical excavation using a JCB backhoe for road crossing executed very close to the live flowline without keeping a safe distance of 1 meter from the live flowline.
Always ensure that you maintain the 1 meter safe distance from live line for mechanical excavation or 0.5 meter to be maintained after ensuing the live line is isolated. Always ensure that you identify the Buried line and mark the entire session. Always make sure that you do the trial pit before mechanical excavation. Always ensure compliance to PTW system as per PR-1172 requirement.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
42
Download:
English