You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#58 Dropped working platform
After rig up the Hoist, the driller observed the block not in the centre to the well. Therefore, the crew decided to rig down the Hoist and adjust it again. While scooping down the upper section of the mast, the traveling block links hit the working platform and broke the safety clamp which was holding the folded working platform. As a result, the working platform dropped from one end and hit the well head.
Always use wire rope sling with shackle instead of using uncertified clamp to fasten the Hoist floor Always include folded Working platform in the DROP survey and checklist. Always follow OEM recommendation. Ensure secondary retention for working platforms prior to the move.
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English