You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#50 Oilfield truck contacted OHL
During Rig 102 infield Move from IHSAN to ALBURJ (14.7 km) . Post finishing TBT, brine tank was loaded on the winch truck trailer. After loading, the driver decided to follow the Oilfield proceeding to New Location The Oilfield truck took a left turn deviating from the surveyed route, the Brine Tank driver following him proceeded in the same route and after advancing approx. 200 meters from the deviated turn, the pole light on top of the Brine Tank contacted the 33 kV Over Head Power Line (9.0 meters high) entangling it and dragging the power line for 30 meters resulting in the breakage of 5 supporting wooden utility poles. No Injury to driver.
Deviating from your route can lead to unforeseen hazards Always travel on the surveyed route and No deviation from the rig move surveyed route. Do not access route having power lines without goal posts and safety barriers. Follow convoy procedures. Ensure you drivers follow the route survey through IVMS system Ensure any deviation from procedures are recorded and properly reviewed Warning Signage must be installed for road users alertness. OHL must be maintained to the standard height for all road crossing. Do not pass underneath the OHL without Goal Post.
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
13
Download:
English