2019 Second Alert HiPo#31 Dropped guard pole during lifting
ATE Sub contractor electrical crew was engaged in guard pole erection at Hawqa 23 road crossing location. The crane operator raised the pole into the vertical position. While attempting to lift the guard pole, the round endless sling failed to grip the pole and the sling slipped off. The concrete pole toppled onto the crane at the rear side of the driver cabin
Always ensure approved lifting plan is available before commencement of lifting activity. Always ensure that correct rigging method is used for lifting. Always ensure right equipment are in place before commencement of task.. Always ensure proper communication and coordination between AP, PA and crew members. Ensure correct rigging method and proper equipment used for lifting activity