You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#54 Crane tipped over
A 50 MT crane lowered the elevator links from rig floor to pipe rack area at the distance of 11 meters from the crane with the boom length of 24 meters, then crane boom swung 7 meters to the right and was lowered to lift casing circulating/fill up tool at the distance of 14 meters, crane tipped over damaging the boom. No injuries.
Ensure Lifting Supervisor is supervising the lifting operation. Ensure the lifting area is barricaded during lifting operation Ensure to STOP the operation on finding unsafe condition or act. Ensure the implementation of lift plan, TRIC and JSA for all non-routine lifting jobs. Ensure outriggers are fully extended and locked on firm footing prior lifting operation
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English