Sign In
2019 Second Alert HiPo#45 Touch Overhead line
Civil crew was deployed for excavation activity for anchor foundation at Qata field.  At around 1110hrs the rock breaker while crossing underneath a nearby 33KV OHL, the boom touched the conductor and resulted in damage of OHL conductor and interruption of power supply to some production wells at Qata filed. No injury to personnel.
Always ensure availability OHL clearance certificate while working near / under OHL Always ensure erection of temporary goal post before allowing heavy equipment to cross under OHL. Always ensure that excavator should not be moved without a clear direction from a banksman. Ensure Dynamic Risk Review is performed on any changes in site activity/conditions. Obtain authorization and ensure controls in place before crossing OHL

Category:Safety AlertsDocument Type:Safety
Format:.pptxViewers:11
Download: