You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#32 Dropped mouse hole
The operation was to rig down the mouse hole in preparation to nipple down 21.1/4” BOP. The mouse hole was lifted in vertical position by crane using wire rope sling. While lowering the mouse hole to the ground, the sling slacked as the mouse hole touched the ground. One sling eye rotated enabling the safety latch to open and the eye came out of the hook. The mouse hole (650 kg) dropped to the ground from a height of around 6m. No injuries occurred.
Never use sling to lift mouse hole. Lifting belt” webbing sling to be used”. Always follow lifting & Hoisting OEM recommendations. Ensure to follow 10 questions for safe lift. Ensure your lifting supervisors are trained in lifting courses as required Always use the approved lifting gear for the operation
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English