Sign In
2019 Second Alert HiPo#31 Lifting
An electrical crew was engaged in guard pole erection at Hawqa 23 road crossing location. The crane operator raised the pole into the vertical position. While attempting to lift the guard pole, the round endless sling failed to grip the pole and the sling slipped off. The concrete pole toppled onto the crane at the rear side of the driver cabin.
Ensure correct rigging method and proper equipment used for lifting activity

Category:Safety AlertsDocument Type:Safety
Format:.pptxViewers:30
Download: