You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA041_HiPo41
At 00:40hrs on the 20 Oct 2018, The operation was Nipple up BOP in the cellar and simultaneously the Driller was trying to setup the BOP Control panel in place behind the drillers console. At this time the travelling block started descending uncontrolled coming into contact with the BOP (hit the oil tray on top of the annular) due to the hoist floor not being installed yet. The complete drilling line came out from Draw Works, all the way up passing the first sheave. As soon the block landed on ground, the remaining drilling line stayed on crown sheave. Due to the slow descend of the travelling block there was no damage to the equipment.
Always ensure a MOC is used when making changes to equipment setup Always ensure locking mechanisms are available for secondary brake systems Always ensure work areas aren't congested Always ensure MOC is used when making changes to equipment setup
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
17
Download:
English