You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA035_HiPo35
During RIH 9 5/8” casing, Roustabout-2 wrapped the webbing sling on the casing joint from V door side to the casing which was rested on the two pipe racks. The Crane Operator moved the crane boom in order to give adequate slackness to the sling, for proper wrapping of the casing in the catwalk side. This move caused the casing to slide towards to the end of the catwalk. Roustabout-1 was standing next to the landed point between catwalk & pipe rack.
Always ensure the crane operator is establishing signal communication with only one dedicated banksman for the lifting activities Always intervene, if you observe any unsafe practice involved in the task. Always ensure the boom is centered and the hook is lowered as low as possible before installing the sling. Always implement and follow No go zone management protocol while working with crane near catwalk.