You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA029_HiPo29
At approximately 10:00 am on 4th of August, Drilling top hole (12.25” ) was in progress. and crew members started picking the third Drill Collar from the catwalk for placing it in to the mouse hole by using the Rig winch (5T). When the Drill collar was half way in to the mouse hole, the winch line got parted resulting the drill collar to drop in side the mouse hole approximately 4 meters along with the parted winch line on the rig floor. There was no personal injury.
Ensure guide arm / similar arrangement is provided to prevent winch lines rubbing on any equipment. Keep clear from the mouse hole area once the pipe is guided in. Always watch the winch line when the load is being attached. Always perform inspection on the lifting equipment, during 6 monthly inspection even if it new. Always ensure lifting gears inspected before use. Always ensure all winch lines are included in the lifting register and third party inspection is valid.