You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA001_LTI08
While a shuttering carpenter was doing de-shuttering of the pump foundation shutter by hammer to loosen the tie-rod’s wing’s plate, one of the bracing pipe (Scaffold tube) fallen on his left hand after it became free and resulted fracture on his left ring finger.
Always ensure minimum two people engaged for fixing/removing pedestal bracing pipes (Scaffold tube) Always ensure sufficient platform/space for standing employees for the work Always ensure removing binding wire tie after loosening of the tie-rod wing’s nut Always ensure using heavy duty hand gloves for shuttering/de-shuttering activities. Intervene if not safe and increase number of STOP/SPOT interventions
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
10
Download:
English