You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2017 Second Alert - LTI#21
During process of Derrickman (DM) changeover, Floorman (FM) relieved DM and pulled & racked back a stand of pipe. DM was standing close to ladder with fall arrester attached in preparation to descend down the ladder. Driller lowered Top Drive System (TDS) which entangled and pulled the fall arrester line along with DM. DM fell (same level) at monkey board platform with left leg trapped between monkey board post & guide beam resulting in a fracture to his left ankle.
Always ensure the TDS is stationary until DM changeover is complete Ensure communication between Driller and DM at all times Ensure right Fall Arrester is used at all times
Category:
LTI Packs
Document Type:
Safety
Format:
.pptx
Viewers:
67
Download:
English