You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2017 Second Alert - LTI#17
After installing rat hole scabbard the Kelly was rested on the rotary. 9-5/8” The crane operator picked up the motor to rotary table. While the 2 Floor men were guiding and pushing motor at rig floor, the crane boom got entangled with Kelly spinner causing Kelly assembly to move and swing towards the motor. As a result the Acting Floorman’s (Floorman-1) right hand ring finger got pinched between the Kelly Bushing Guard & the motor assembly. Floorman-2 received back pain, when he was pushed by the Kelly.
Always identify the hazards & dynamic risks during TBT Make sure effective supervision is implemented during the task Always discuss/implement 4 H & F golden Question to perform the task Hands free. Maintain safe body position and stay away from line of fire, No Go zone requirements are strictly implemented. Ensure that there is no static / dynamic obstacles in the direction / area of the lift.
Category:
LTI Packs
Document Type:
Safety
Format:
.pptx
Viewers:
60
Download:
English