You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2017 Second Alert - HiPo#5
While drilling 8½” hole section, the Derrickman observed that the stabber guide was hanging by its secondary retention. The Driller was informed and the operation was stopped immediately. A safety meeting was conducted with site supervisors and crew members to discuss required action to rectify the situation, Drill pipe stand was racked back and TDS was descended to the rig floor so the stabber guide could be reattached.
Secondary retention worked effectively preventing a DROPs incident Learning from an previous incident was utilized and implemented preventing a DROPs incident Incorrect bolts were installed as means of primary retention for the stabber guide bracket Bolt length and threads weren't inspected prior to reinstallation Lock wire on the bolts wasn’t installed correctly
Category:
Second Alerts