You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2016 Second Alert - LTI#42 AIPS & LTI
Bahja Gathering station was recently by passed and the Operations team were preparing for the facility to be Decommissioned. When the team proceeded with depressurizing the Gas section the Flare KOD vessel ruptured and exploded injuring the operator. It was a closed valve in the flare line after this low pressure vessel resulted in pressure build up, followed by rupture, explosion and fire.
Align LO/LC register with PEFS and ensure compliance with 3-month and 6-month checks & audit. Preparatory activities for Decommissioning to be Planned Method statement prepared Risk assessment done Actual site conditions verified with drawings Walk the line Necessary resources and interfaces be identified and confirmed
Category:
Second Alerts
Document Type:
General
Format:
.pptx
Viewers:
8
Download:
English