2016 Second Alert - LTI#42 AIPS & LTI
Bahja Gathering station was recently by passed and the Operations team were preparing for the facility to be Decommissioned. When the team proceeded with depressurizing the Gas section the Flare KOD vessel ruptured and exploded injuring the operator. It was a closed valve in the flare line after this low pressure vessel resulted in pressure build up, followed by rupture, explosion and fire.
Align LO/LC register with PEFS and ensure compliance with 3-month and 6-month checks & audit. Preparatory activities for Decommissioning to be Planned Method statement prepared Risk assessment done Actual site conditions verified with drawings Walk the line Necessary resources and interfaces be identified and confirmed