You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2016 Second Alert - LTI#35 LTI
The task was to prepare nipple down BOP. After unscrewing all the BOP nuts and studs, the Floorman-1 was coming out from the cellar, holding the pad eye of the substructure lower beam. At the same time, the Floor man-2 unintentionally operated off Driller’s side (ODS) BOP hoisting winch which resulted in the tilting of BOP from one end. Consequently the Floorman-1’s right hand thumb finger got trapped in between the pad eye and BOP shear ram bonnet.
Ensure you follow the procedures/instructions of your immediate Supervisor. Identify all the hazards, assess the risks and controls prior to all tasks. Intervene if the task is performed unsafely or if the instructions are not being followed. Isolate equipment/ winch controls after use & keep the equipment winch control in its designated safe place. Ensure the BOP winch operation controls are carried out only by the crew after receiving adequate training and assessment, to perform the task in a safe manner.
Category:
Second Alerts
Document Type:
General
Format:
.pptx
Viewers:
26
Download:
English