Sign In
Properly secure high pressure lines and stay clear of them

Learning points:

  • Ensure that temporary pipe-work are secured before applying pressure through them.
  • Ensure proper line up prior bleed off operation and only choke valve to be used.
  • Eliminate the use of flexible hose and swivel type elbows down stream of choke.
  • Review the JSAs dealing with the pressuring of temporary pipe-work, and address the need for personnel to stay clear of the lines when under pressure.

Recommended Actions:

Discuss this alert in toolbox talks and HSE meetings and

  • Distribute to all contractors
  • Post on HSE notice boards
  • Include in site HSE induction


Category:Second AlertsDocument Type:Safety
Format:PPTViewers:622
Download: