You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
Lifting of MWD short monel by using crane
The directional Monel measuring 2.61 m length was lifted to the rig floor by using one flat web sling on crane. The monel was kept rested on the rig floor on one edge and still suspended in the crane. When MWD engineer attempted to remove the protector of the monel in hanging position, the monel slipped out of the sling and slid down the v-door to catwalk. No injury to personnel, No damage to tool.
Use lifting caps on both pin and box to lift short monel by using crane with slings and shackles , Or use air winch with lifting cap. Always place equipment on a flat surface.
Inadequate Equipment / the 6 m long sling was inadequate for the job and was incorrectly used. Failure to follow procedure / the monel was rested on one edge on rig floor instead of placing on a flat surface.
Category:
Safety Alerts
Document Type:
Safety
Format:
PDF
Viewers:
1,268
Download:
English
Arabic