You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
Underground Installations
A recent high potential incident highlights the need to alert personnel to the dangers of drilling or digging on PDO installations. The incident occurred during soil sampling in preparation for the construction of a telecommunications tower. A core sample was being taken using a coring rig. A permit to work was obtained and the site was checked for buried cables using hand tools before the drilling started. A pilot trench was hand dug and drilling began shortly afterwards. The drill severed a 415 volt buried supply cable causing loss of power to a nearby well. No injuries were sustained by the workers.
Category:
Second Alerts
Document Type:
Safety
Format:
Viewers:
1,059
Download:
English