You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2021 2nd Alert HiPo02 during POOH activity the tool string fell on rig floor
On the last run after the prong was set @ 80 m +/-; The slickline supervisor started POOH, and reduced the speed once close to surface. At 4 m below the rotary table, the slickline supervisor kept POOH while trying to reach the Assistant Operator via Walkie Talkie to give him signals to stop, meanwhile the tool string went out of the landing joint and hit the upper sheave causing the slickline wire to be parted and the tool string fell on the Rig Floor.
Ensure winch is stopped when at surface and signals confirmed before continuing operation. Always ensure proper communication and clear signaling between winch operator and operator on rig floor. Always ensure Drops red zones are well managed and followed. If in doubt STOP the job. Always set winch alarm & shutdown and update it periodically throughout of operation.
Category:
Second Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
7
Download: