You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HVL#01 (OHL) NRPS Instrument cable cut by JCB
While removing (excavated soil) using backhoe, the bucket teeth came in contact with the live instrument cable laid at 180mm below the ground and cut it in two parts, resulting in tripping of 2 export pumps and 6 wash oil pumps at NRPS, Nimr.
Always resort to manual means for removal of soil when in doubt. Always ensure that the waste soil is dumped at a place free from underground services. Always place waste soil in an area which is easily accessible.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
34
Download:
English