You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#51 (Drops) DP & FOSV disengaged out of power swivel connection and dropped through the V-door
Hoist was in operation of laying down 3.5” DP joint using the power swivel. Drill pipe joint was hanged up with power swivel for soft break out, then while lowering DP to lay down, drill pipe with FOSV disengaged out of power swivel connection and dropped through the V-door and rested on the ground. No one was injured and No damage to equipment.
Always comply to the Drops zone management – utilize rig floor Step back safety zone whenever possible. Always ensure Planning and risk assessments are carried prior any task. Although it is standard practice, ensure power swivel procedure includes soft break out and laying down drill pipes. Have a proper respond in place for over torqued connections to soft breakout. Always ensure efficient leadership for the tasks ahead.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
52
Download:
English