You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#43 (Drops) circulating head
At approximately, 01.35 hrs., During running 13 3/8” casing, drilling crew had difficulty to run the casing joint due to down hole restriction. Crew decided to wash down casing joint using circulating head and managed to run 4 joints successfully till they reached last joint to be run when circulating head suddenly disconnected causing swivel joint, circulating hose and circulating head to drop from top of casing joint to rig floor landing near the rotary table towards the V Door.
Always ensure two (2) chain tongs are used for makeup circulating head. Always ensure you properly install secondary retention on circulating Assembly. Always ensure your SOP include connection back off precautions. Always ensure critical tasks are supervised by Tool pusher/ Night pusher. Always ensure connections are made up to maximum torque. Always ensure dynamic risk are assessed and proper safety controls are in place.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
10
Download:
English