You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#30 (Drops) liner hanger running tool
During laying down of liner running tool (total length of Running tool was 12m) onto the cat walk using rig winch from top side and crane with sling from the lower part. A bend on the string was noticed, the string parted from the connection below the running tool. The running tool was at a height around 7m above the cat walk and the lower part length was about 6m. Each part hung and swung above the cat walk area. Catwalk area was clear of personnel. The two parts were laid down separately.
Always perform risk assessment prior to commencing a task Always prepare lift plan to address every lift. Always involved all concerned parties into the pre-task safety discussion. Always address all safety precautionary measures requested by PTW procedure. Always STOP unsafe acts/conditions. Always ensure tandem lift is given additional considerations. Always fully address 10 questions for a safe lift prior to lifting.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
44
Download:
English