You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#18 (Drops) landing joint
After 9-5/8” casing cement job , Driller picked up landing joint and 2 floormen guided the landing joint to pass through the riser. Suddenly the landing Joint got stuck at bottom edge inner part of riser(riser consists of two telescopic pipes), both shackle used to connect the hydraulic single joint elevator (HSJE) to the Casing Running Tool (CRT) parted, resulting in landing joint assembly dropping and resting on the well head. No injuries to anyone.
Always ensure to set the Hook load limit as per the over pull limit of the particular lift. Always ensure to pull through all obstructions slowly with proper communication. Always ensure once obstructions are passed, STOP and ask crew to clear the rig floor before continuing to pull with close monitoring of the hook load. Always ensure to keep only the minimum essential personnel in the Red Zone. Always ensure while pulling tools at surface there is no margin for stretch like in drill pipe pulled from bottom.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
20
Download:
English