You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#84 Drops
While RIH Sucker rod completion, the 6th Sinker bar was picked up using sucker rod elevator from power catwalk, Assistant Driller (AD) realized the block was near racking board and applied sudden brake (jerk). As a result, the elevator came off the SR hook causing the sinker bar and the elevator (100Kg) to drop (13m) to ground.
Always ensure to maintain a safe working speed and assess all the dynamic risks associated with external factors (wind speed, visibility….etc.). Always ensure tubular handling equipment are checked before use. Always follow the proper inspection procedures for handling equipment. Always ensure all defected equipment are repaired/changed immediately.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
13
Download:
English