Sign In
2019 Second Alert HiPo#84 Drops
While RIH Sucker rod completion, the 6th Sinker bar was picked up using sucker rod elevator from power catwalk, Assistant Driller (AD) realized the block was near racking board and applied sudden brake (jerk). As a result, the elevator came off the SR hook causing the sinker bar and the elevator (100Kg) to drop (13m) to ground.
Always ensure to maintain a safe working speed and assess all the dynamic risks associated with external factors (wind speed, visibility….etc.). Always ensure tubular handling equipment are checked before use. Always follow the proper inspection procedures for handling equipment. Always ensure all defected equipment are repaired/changed immediately.

Category:Second AlertsDocument Type:Safety
Format:.pptxViewers:13
Download: