Sign In
2019 Second Alert HiPo#36 Rig contact goal post
During the rig move from Lekhwair 934 to MAZ 22 the monkey board fallarester pole on the main rig carrier came into contact with the 13m goalpost cable causing the cable to snap and fall to the ground
Always report incidents when they happen Ensure the crews prepare the loads properly for rig move (safe heights understood) Second means required to assure that the loads are safe to transport off of location It does not leave location if it is too high.

Category:Safety AlertsDocument Type:Safety
Format:.pptxViewers:17
Download: