You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#33 parted chain sling Dropped
Prior to raising the mast, the traveling block was secured with rig floor shoe by means of a chain sling. Later, the mast was raised 1 meter off the stand and rig team waited for few minutes to confirm whether mast raising cylinder was holding. After being satisfied the cylinder was holding they decided to continue raising it. The mast was further raised up to four meters, the chain sling to be in tension resulting in the sling parting. Due to drill line pull, the block slid from rig floor and landed on the ground from a height of 5.10 meters. No injury happened NO GO was established.
Always ensure close supervision to be assigned to all tasks based on their criticality Always Use certified and fit for purpose lifting equipment's. Always ensure that all hazards must be captured in Control of work i.e WI, TRIC , JSA etc. Always ensure that Control of Work must be verified by base supervisor prior commence the job. Driller Must Stay Focused While Engaged in Critical Task