Sign In
2019 Second Alert LTI#03 Hands & Fingers
Crane operator attempted to release the stack wire-rope using both of his hands, while the crane hook block was still above ground level, hence crane wire-rope was under tension. The stuck wire-rope suddenly released crushing the operator’s right little finger between the line and block sheave.
Always keep your hands/fingers away from crush points and ensure understanding the risk of stored energy . Always follow proper maintenance and troubleshooting procedures. All personnel are obliged to STOP when intervened for unsafe act, . Always ensure effective TBT with clear roles & responsibilities for all involved. Always ensure the lift plan is in place for high risk activity Never place your hands between the line and sheave

Category:Safety AlertsDocument Type:Safety
Format:.pptxViewers:14
Download: