You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#18 DROPs
After jarring, during RIH 2.7/8” CMT stinger, rotating lock (around 2.5 kg) on the travelling block fell down (10 m height) to the rig floor. All employees were out of the red zone during the time of the incident.
Always include rotation lock in the DROPS inspection checklist and carryout detailed DROPS inspection after jarring operation. Always install secondary retentions on the rotating lock. Always ensure that not more than 3 bolts are lock wired together and span between bolts not exceeding 15 cms. Always follow the recommendation from the OEM while defining the maintenance frequency. Ensure secondary retention on all potential DROPS objects
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
12
Download:
English