You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#01 Lifting
On Friday 10th of January 2019 on the Fahud compression project, a Mechanical crew were engaged in lifting operation using a 3.3 TON / 5.5m side boom loader for 24 inch 24m GRE pipes. While moving the load the lifting belt slipped out of the hook causing one side of the boom to drop which luckily resulted is minor damage and no injury
Always fully comply with the approved lift plan. Use the correct equipment for the correct purpose as described in the approved lift plan. Always intervene for any unsafe action Only lift when the lifting supervisor is present Always use the 10 questions for a safe lift When in doubt don’t lift
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English