You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA049_HiPo#18
Whilst breaking out the 6 1/2" Drill Collar using the Manual tong, the long jaw hinge pin and jaw parted. The long jaw including the latch assembly landed approximately 1 m away from the Driller’s console. No injury resulted from this incident.
Ensure periodic inspection and verification are conducted. Ensure the inspections meet the required standards. Verify the inspection reports and quarantine all defective equipment. Always inform management of defective equipment immediately.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
17
Download:
English