Sign In
2017 Second Alert - LTII#23
During the raising of the mast, the Hoist became unstable due to uneven jacks levelling and tipped over trapping the driller between the hand rail and the ground resulting in a fracture to his right leg.
Always ensure the Rig carrier is levelled prior to set Up. Always install Turnbuckle prior raising the mast. Properly manage high risk areas by minimizing number of persons in area. Conduct a Risk Assessment when the conditions change.

Category:LTI PacksDocument Type:Safety
Format:.pptxViewers:188
Download: