You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2015 - LL13-LTI#10-Fractured toes
Trainee AD connected the two ends of the 6 meter long hose to the two-leg chain hooked-up to the forklift boom, using the safety clamps eyes as points of attachment. As the hose was being lowered, the hook worked its way out of the eye resulting in the hose flexing out diagonally and struck the trainees right foot fracturing his toes.
Always maintain a safe distance from a suspended load.
Lifting of flexing hose requires a lifting plan, JSA and TRIC. In case soft slings are used, a PTW should be issued. Never stand near the load during picking up, travelling or lowering of the load. ......
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
12
Download:
English