You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
Peace River Fatality Learning Package
Peace River Complex -Pad 40 Construction
Aug. 1, 2002 at 1640 hrs.
High-voltage specialist contractor crew of 4 on-site to tie-in and test the 25kvpower supply
One worker electrocuted from an energized 25kv transformer primary
One other worker seriously injured but survived
Two others not injured
All terminations completed and all that remained was to test the transformer secondary voltage
Primary-side doors left open after cable termination work
Secondary-side doors previously locked after utility company meter installation
Main switch in motor control centre confirmed open and locked
Tool box talks prior to starting any job could have prevented this incident
Ineffective Communication
Electrical Permit To Work was not used
Category:
Safety Alerts
Document Type:
Safety
Format:
PDF
Viewers:
1,926
Download:
English