You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2021 2nd Alert HiPo55 Koomey unit dropped during lifting
During rig Move/up activities, one of the tasks was to spot the (BOP HPU: Hydraulic Power Unit) next to the subbase. This requires loading it from its position near runoff area and placing it on Oil field truck, then offload the same on the target spot near subbase. When the loading started and at around a height of 1m above the ground, the load became unbalanced causing one of the sling to slip from the skid trunnion (lifting points ).The HPU unit then flipped 90 degrees to the side due the sudden unbalance at such height on both cranes . No one was injured.
Ensure Critical lifts must be supervised and led by competent lifting supervisor. Ensure the lifting equipment's ( sling, shackle, cranes etc.) are fit for the task Ensure that any critical lifts has an approved lift plan which should be reviewed before the lift. Verify that the rigging method and sling selection is done in accordance with the lifting plan. Ensure the red zone is fully controlled before starting any lift.
Category:
Second Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
76
Download: