You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2021 2nd Alert HiPo40 Elevator opened and drill pipe dropped near catwalk
The POOH of Polish mill assembly on 3 ½ IF DP string was in progress. At around 13.45 (24.07.) the 23rd joint was B/O with power tong and while laying the joint down the V-Door the Elevator suddenly opened when it was approx. 2.5mtrs above the rig floor. The joint was already in the V-Door with its half length once the elevator opened and the joint uncontrollably slid down the V-Door and rested on the right side of the pipe racks.
Always Comply to Drops zone management, utilize step back safety zone whenever possible Always Observe the path of the elevator while tripping and during laying down the Tubular thru the V-Door (Tubular smooth motion) Always Ensure the Elevator is properly latched (Floorman to “thumb up” to the driller prior to picking the string) Straight line V-Doors is preferred , always inspect the equipment pre use, check the condition of the V-Door and catwalk groove
Category:
Second Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
63
Download: