You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2021 2nd Alert HiPo08 CT-reel swivel get parted and fall on the ground with the pump iron connected to it
During CT Scale milling operation and while POOH approximately 4490 m, suddenly the reel swivel assembly disconnected and fell on the ground along with the pumping line (~170 kg) from height of 3 meters. The supervisor immediately took all the necessary precautions, stopped pumping, and secured the well. The area was barricaded and no one from the crew was around. . SQM immediately headed to the field to evaluate the situation with PDO and decided to POOH and mobilize CT back to base for further investigation and to rectify the defective part
Always use parts that comply with OEM recommendations and specifications. Always ensure to secure pumping lines to the reel swivel with FSR. (Flow line Safety Restraint System). Always ensure walk the line & P&ID is conducted prior starting the operation. Always implement and manage the No Go & Red Zones
Category:
Second Alerts
Document Type:
Safety
Format:
pptx<br/>
Viewers:
43
Download: