You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd Alert HVL#19 (Drops) During lay down dp , the dp JT fall down through V-door
During lay down 3.1/2" DP from rig floor to catwalk by using mobile crane and two web slings. The lifted pipe was not in balance position (lower web sling was not in right position) as a result lower web sling slip up and the DP joint moved to vertical position through V-door and hanged by crane. “Temporary No Go Zone” was well managed and No body injured.
Always ensure to adhere with red zone, No go zone management. Always ensure that no one standing in the line of fire. Always ensure Rigging method are done properly before lifting tubulars. Always do not open elevator before making sure it is free of any load. Always ensure lift plan is in place and followed.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
65
Download:
English