You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HVL#02 (Drops) STV hit by TDS
The operation was to install wear bushing using one stand of 5” HWDP. One stand of 5” HWDP stand was transferred to the hydraulic elevator by STV( Stand Transfer Vehicle). After that, the derrick man retracted the arm of STV out of the well centre to the monkey board side and connecting wear bushing Running Tool (R/T), the driller started to RIH when he suddenly noticed indication of weight slack off. He stopped to check and found that hydraulic elevator did hit the STV ( untracked accidentally without control) resulting in a bend of diving board & sheared two lock screw bars,3 pins dropped on the rig floor. Each weight= 387g height is 26 m. Nobody was standing in the red zone.
Always follow STV operation SOP (put in parking position when not used) Always check the surrounding condition of traveling block before operate traveling block. Always Ensure HPU of STV is power off during drilling operation. Always Ensure secondary retention is in place for any potential dropped object.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
41
Download:
English