Sign In
2020 2nd alert HiPo#49 Technician wrongly cut a live cable
A civil technician cut a exposed cable inside the trench assuming it to be a redundant one, permit holder also did not verify the cable status before giving the permission.
Comply with the PTW requirements. Follow the procedure and STOP the job if it is unsafe. Never take decisions on assumptions and consult supervisors. Use empowerment and say ‘’NO’’ to unsafe work. Consult Permit Applicant and carryout DRA incase of any change. Never try to cut any exposed cable, inform electrical team for assistance.

Category:Second AlertsDocument Type:Safety
Format:.pptxViewers:62
Download: